Hint: It is a hydropower project. It is the most established under power venture. It was made on the wangchu river.
Complete step-by-step solution:
Chukha project is the most useful river project in Bhutan. Bharat Heavy Electricals Limited (BHEL) has charged Unit 1 of the 336-MW Chhukha hydroelectric task (HEP), following total redesign and modernization of the generator.
Bharat Heavy Electricals Limited (BHEL) has charged Unit 1 of the 336-MW Chhukha hydroelectric undertaking (HEP), following total remodel and modernization of the generator.
Chhukha (additionally called Chukha) is a run-of-stream venture on the Chhukha River in Bhutan and was initially charged during the 1980s. These generators were initially provided and appointed by BHEL. Druk Green Power Corporation (DGPC), which possesses and works the task, submitted a redesign and modernization request for the Chhukha hydropower plant for substitution of Unit 1 and 3 generator stator and rotor curls.
Chhukha (likewise called Chukha) is a run-of-waterway venture on the Chhukha River in Bhutan and was initially dispatched during the 1980s. These generators were initially provided and dispatched by BHEL. Druk Green Power Corporation (DGPC), which claims and works the venture, submitted a redesign and modernization request for the Chhukha hydropower plant for substitution of Unit 1 and 3 generator stator and rotor loops.
The redesigned and modernized Unit 3 was charged a year ago.
Thus, option (B) is correct.
Note: As per the International Hydropower Association, Bhutan has a populace of 765000, with an introduced hydropower limit of 1615 MW and a hydropower age of 7780 GWh yearly. IHA says Bhutan has high hydropower potential, with around 23760 MW distinguished as financially doable.
Complete step-by-step solution:
Chukha project is the most useful river project in Bhutan. Bharat Heavy Electricals Limited (BHEL) has charged Unit 1 of the 336-MW Chhukha hydroelectric task (HEP), following total redesign and modernization of the generator.
Bharat Heavy Electricals Limited (BHEL) has charged Unit 1 of the 336-MW Chhukha hydroelectric undertaking (HEP), following total remodel and modernization of the generator.
Chhukha (additionally called Chukha) is a run-of-stream venture on the Chhukha River in Bhutan and was initially charged during the 1980s. These generators were initially provided and appointed by BHEL. Druk Green Power Corporation (DGPC), which possesses and works the task, submitted a redesign and modernization request for the Chhukha hydropower plant for substitution of Unit 1 and 3 generator stator and rotor curls.
Chhukha (likewise called Chukha) is a run-of-waterway venture on the Chhukha River in Bhutan and was initially dispatched during the 1980s. These generators were initially provided and dispatched by BHEL. Druk Green Power Corporation (DGPC), which claims and works the venture, submitted a redesign and modernization request for the Chhukha hydropower plant for substitution of Unit 1 and 3 generator stator and rotor loops.
The redesigned and modernized Unit 3 was charged a year ago.
Thus, option (B) is correct.
Note: As per the International Hydropower Association, Bhutan has a populace of 765000, with an introduced hydropower limit of 1615 MW and a hydropower age of 7780 GWh yearly. IHA says Bhutan has high hydropower potential, with around 23760 MW distinguished as financially doable.
Recently Updated Pages
Master Class 11 English: Engaging Questions & Answers for Success

Master Class 11 Maths: Engaging Questions & Answers for Success

Master Class 11 Biology: Engaging Questions & Answers for Success

Master Class 11 Social Science: Engaging Questions & Answers for Success

Master Class 11 Physics: Engaging Questions & Answers for Success

Master Class 11 Accountancy: Engaging Questions & Answers for Success

Trending doubts
What is BLO What is the full form of BLO class 8 social science CBSE

Citizens of India can vote at the age of A 18 years class 8 social science CBSE

Full form of STD, ISD and PCO

Convert 40circ C to Fahrenheit A 104circ F B 107circ class 8 maths CBSE

Advantages and disadvantages of science

Right to vote is a AFundamental Right BFundamental class 8 social science CBSE