The length of Sharavathi river bridge on Konkan Railway is _______.
A.1.2 kms
B.2.2 kms
C.2.9 kms
D.3.5 kms
Answer
549.6k+ views
Hint:The Sharavati street connect was built in 1984 with a general length of 1047.65 meters, involving 34 ranges of 30 meters each. The two end ranges are adjusted cantilever arms. Every primary range comprises five prestressed "I" supports put on hammerheads.
Complete answer:
The Sharavati Bridge is situated in the south of Honnavar which is in the province of Karnataka, India. It was finally finished in 1994.. Its complete length is 2.2 km. It is the longest scaffold on Konkan railroad, and the longest rail route in the state.
The work or project consisted of development of a 2,060-meter-long (6,760 ft) connection having 55 ranges of 33 m and 11 ranges of 22 m. The establishment comprises four 1.2-meter-breadth (3.9 ft) cast-in-situ R.C.C. exhausted heaps for pier and eight 1.2-meter-width heaps for projections. The superstructure was with a solitary post-tensioned box brace for 33 m ranges and three precast pretensioned I support for 22 m ranges. This extension at Honnavar was granted second prize in the opposition for Most remarkable Bridge National Awards 1995 – Category I by Indian Institute of Bridge Engineers in the year of 1995.
Hence, the correct answer is option (B).
Note:The recovery of the extension was done by Freyssinet Prestressed Concrete Company Ltd (FPCC) by reinforcing the pier and hammerheads with extra steel sections and outer prestressing of principle braces. The heap test was completed to evaluate lingering prestress in the supports.
Complete answer:
The Sharavati Bridge is situated in the south of Honnavar which is in the province of Karnataka, India. It was finally finished in 1994.. Its complete length is 2.2 km. It is the longest scaffold on Konkan railroad, and the longest rail route in the state.
The work or project consisted of development of a 2,060-meter-long (6,760 ft) connection having 55 ranges of 33 m and 11 ranges of 22 m. The establishment comprises four 1.2-meter-breadth (3.9 ft) cast-in-situ R.C.C. exhausted heaps for pier and eight 1.2-meter-width heaps for projections. The superstructure was with a solitary post-tensioned box brace for 33 m ranges and three precast pretensioned I support for 22 m ranges. This extension at Honnavar was granted second prize in the opposition for Most remarkable Bridge National Awards 1995 – Category I by Indian Institute of Bridge Engineers in the year of 1995.
Hence, the correct answer is option (B).
Note:The recovery of the extension was done by Freyssinet Prestressed Concrete Company Ltd (FPCC) by reinforcing the pier and hammerheads with extra steel sections and outer prestressing of principle braces. The heap test was completed to evaluate lingering prestress in the supports.
Recently Updated Pages
The number of solutions in x in 02pi for which sqrt class 12 maths CBSE

Write any two methods of preparation of phenol Give class 12 chemistry CBSE

Differentiate between action potential and resting class 12 biology CBSE

Two plane mirrors arranged at right angles to each class 12 physics CBSE

Which of the following molecules is are chiral A I class 12 chemistry CBSE

Name different types of neurons and give one function class 12 biology CBSE

Trending doubts
Which are the Top 10 Largest Countries of the World?

What are the major means of transport Explain each class 12 social science CBSE

Draw a labelled sketch of the human eye class 12 physics CBSE

Differentiate between insitu conservation and exsitu class 12 biology CBSE

The computer jargonwwww stands for Aworld wide web class 12 physics CBSE

State the principle of an ac generator and explain class 12 physics CBSE