Asia's largest wind farm using wind waves for generating power is at
(a)Kyota (Japan)
(b)Lamba (Gujrat)
(c) Kazakistan
(d)Pokhran (India)
Answer
Verified
464.1k+ views
Hint: This place is located on the west coast of India, sharing a boundary with Rajasthan and the Arabian sea. During the pilot stage of this plant for 3 months, It was able to produce 1500+ kWh successfully.
Complete answer:
The largest farm in Asia where wind waves are used for generating power is located at Lamba (Gujrat). Wind is a renewable source of energy. Lamba is a village in the Jamnagar district located in Gujrat.
Additional Information: -India has a wind power capacity of 37.669 GW, which makes India the fourth largest wind power capacity installed globally.
-Maneklal Sankalchand Thacker is an Indian power engineer who started a project with the Indian Council of Scientific and Industrial Research (CSIR) to develop the possibilities of converting wind power to electrical energy for the country
-Maneklal Sankalchand Thacker’s exploration of wind power, improving India's renewable energy sources began in December 1952.
So, the correct answer is ‘Lamba (Gujrat)’.
Note: -The Tamil Nadu Government initiated a separate government based agency, known as the Tamil Nadu Energy Development Agency, after knowing the potential and need for an inexhaustible energy source, which made Tamil Nadu the largest wind power capacity which contributes around 29% of India's total wind power capacity.
-The initiations and support provided by the government of India reduced wind power costs in India rapidly to a record rate of ₹2.43 per kWh. This also increases the number of users and tempts them to shift to renewable energy from conventional sources.
-Lamba village belongs to the taluka of Kalyanpur which is 436 km from Gandhinagar, a major urban area of Gujarat.
Complete answer:
The largest farm in Asia where wind waves are used for generating power is located at Lamba (Gujrat). Wind is a renewable source of energy. Lamba is a village in the Jamnagar district located in Gujrat.
Additional Information: -India has a wind power capacity of 37.669 GW, which makes India the fourth largest wind power capacity installed globally.
-Maneklal Sankalchand Thacker is an Indian power engineer who started a project with the Indian Council of Scientific and Industrial Research (CSIR) to develop the possibilities of converting wind power to electrical energy for the country
-Maneklal Sankalchand Thacker’s exploration of wind power, improving India's renewable energy sources began in December 1952.
So, the correct answer is ‘Lamba (Gujrat)’.
Note: -The Tamil Nadu Government initiated a separate government based agency, known as the Tamil Nadu Energy Development Agency, after knowing the potential and need for an inexhaustible energy source, which made Tamil Nadu the largest wind power capacity which contributes around 29% of India's total wind power capacity.
-The initiations and support provided by the government of India reduced wind power costs in India rapidly to a record rate of ₹2.43 per kWh. This also increases the number of users and tempts them to shift to renewable energy from conventional sources.
-Lamba village belongs to the taluka of Kalyanpur which is 436 km from Gandhinagar, a major urban area of Gujarat.
Recently Updated Pages
A uniform rod of length l and mass m is free to rotate class 10 physics CBSE
Solve the following pairs of linear equations by elimination class 10 maths CBSE
What could be the possible ones digits of the square class 10 maths CBSE
Where was the Great Bath found A Harappa B Mohenjodaro class 10 social science CBSE
PQ is a tangent to a circle with centre O at the point class 10 maths CBSE
The measures of two adjacent sides of a parallelogram class 10 maths CBSE
Trending doubts
Imagine that you have the opportunity to interview class 10 english CBSE
Find the area of the minor segment of a circle of radius class 10 maths CBSE
Fill the blanks with proper collective nouns 1 A of class 10 english CBSE
Frogs can live both on land and in water name the adaptations class 10 biology CBSE
Fill in the blank One of the students absent yesterday class 10 english CBSE
Write a letter to the Principal of your school requesting class 10 english CBSE